ASME HPV East 2013: Log 2 - Final Prep



Woke up in a very cold, below 0 degrees temperature this morning. After breakfast at McDonalds, we start working on the bike. There's still lots to be done before the safety and technical inspection this in the afternoon. The chain, the seat, among the big things that needs to be done. Ferris State HPV team has been very helpful to lend us some space in their workshop.


Around 3pm, all the necessary things are done. And so, CELERO is ready for the event. Woohoo!!

- Posted using BlogPress

Comments

Popular posts from this blog

life as a "pak cik"

ASME HPV East 2013: Log 5 - Good Ending

tudin dh boring